Bryn Posteg Wales
History:
Since March 2003 electricity generation from landfill gas has been undertaken at Bryn Posteg Landfill Site, Llanidloes, Wales. Currently the methane extraction plant is capable of producing 2MW.
An Operations and Maintenance Agreement is in place with Finning Power Systems operating a Caterpillar generator-set.
Project Expansion:
The short term plan for this site is to optimise the current production by tapping into mature cells. Expansion of new wells due in 2009.
Long term goal is to tap into cells which are currently being filled, this has the potential to increase production to 5/6MW.
PPA (Power Purchase Agreement) in place with EDF Energy (UK).
Click here to see pictures of the Bryn Posteg site
|
|
Bryn Posteg generation facility |
|
|
|
|
|
|
|
|
Bryn Posteg mature Well ready for new cells |
|
Bryn Posteg New Cells |
|
|
|
|
Bryn Posteg New Cells |
|
Bryn Posteg New Cells |
|
|
|
|
Bryn Posteg New Cells |
|
Bryn Posteg New Cells |
|
|
|
|
Nightly waste covering with clay |
|
Nightly waste covering with clay |
|
|
|
|
Nightly waste covering with clay |
|
Nightly waste covering with clay |
|
|
|
|
Main Gas Pipe |
|
Active Extraction Fans |
|
|
|
|
Internal Cumbustion Engine |
|
|
|
|
Total Gas Generation (m3/h) for Bryn Posteg |
|
|
|
|
|
|